Plumbing Quote Template for Australian Plumbers

A plumbing quote template is a ready-made pricing sheet for plumbers that covers rough-in, fit-off, fixtures, labour and margin across jobs like new builds, bathroom renovations, hot water changeovers and blocked drains. A trade-specific template beats a blank invoice because it prompts you for the lines you forget to charge, like the second visit for fit-off and the compliance certificate. Grab the free version below, or price plumbing jobs live from the plan in QR-rise.
The structure follows the same bones as our full construction quote template: parties, scope, itemised lines, GST, exclusions, terms and acceptance. The line items here are tuned to plumbing work, where the money leaks are fixtures the client supplies, dig-and-connect unknowns, and the two-visit nature of most jobs.
Plumbing quote template: line items by job type
Start from the job type and let the prompts pull the quote out of you.

New build or extension
Split the job into rough-in and fit-off, because they happen months apart and get paid at different stages. Rough-in covers the drainage, water and gas pipework in the walls and slab before the linings go on. Fit-off covers the tap ware, toilets, basins, the hot water unit and testing at the end. Price the fixtures separately from labour, and note clearly whether you or the client supplies them.
Bathroom renovation
Price the strip-out and disposal, the rough-in changes, waterproofing if that is your scope, the fixtures, and fit-off. Add a provisional sum for anything behind the wall you cannot see yet, like old galvanised pipe that needs replacing. A labelled allowance here saves an argument later.
Hot water changeover
Price the unit, the labour to swap it, any tempering valve or compliance upgrade the changeover triggers, and disposal of the old unit. Note lead time on the unit if stock is tight.
Blocked drains and service
Charge a minimum call-out or first-hour rate, then time and materials. Add a line for a camera inspection or jet-rodding if the job needs it, and quote any excavation as a variation once you know what is down there.
The lines plumbers forget to charge for
Ask any experienced plumber where quotes leak, and it is rarely the copper. It is:
- The second visit. Rough-in and fit-off are two trips, and the travel and setup on both are real.
- The compliance certificate and inspection time.
- Making good and access: cutting and patching, lifting and relaying, tight subfloor crawls.
- Consumables: solder, fittings, clips, sealant, sand for bedding.
- Client-supplied fixtures that turn up wrong or late.
A worked example with GST
Say you are quoting a bathroom renovation rough-in and fit-off. You price the strip-out, the rough-in labour and materials, the fixtures you are supplying, and the fit-off. On a job with a cost of 4,200 dollars, you add your margin to reach a price of 5,600 dollars. Add 10 percent GST of 560 dollars for a GST-inclusive total of 6,160 dollars, shown as its own line. You add a provisional sum of 400 dollars for possible pipe replacement behind the wall, clearly labelled so the client knows it can move. For the takeoff side of a bigger job, see how to quote a house build.
Template vs quoting software: when to switch
The template is ideal for a handful of jobs a month. When the volume climbs, retyping fixtures and labour into a spreadsheet gets slow and error-prone. In QR-rise, you measure pipe runs and count fixtures on the PDF plan, and each one feeds a priced line. Change the plan, and the price recomputes, and the total is worked out server-side so it always matches the detail. Work a different trade? The same pattern exists in the carpentry quote template.
Download the template or quote live: free 30-day Pro trial
The template and fill-in tool are free to use, no signup. When you want to save the quote, send it as a branded PDF, and turn accepted quotes into invoices with staged payments, that is the Pro trial. Start your 30-day Pro trial, or stay on the free capped plan for occasional quoting.
Frequently asked questions
What should a plumbing quote include?
Your business and licence details, a clear scope split into rough-in and fit-off where relevant, itemised fixtures and labour, GST shown separately, exclusions, payment terms and a validity period. Note who supplies the fixtures.
How do you quote a bathroom renovation as a plumber?
Price the strip-out, the rough-in, the fixtures, and the fit-off as separate lines, then add a labelled provisional sum for anything you cannot see behind the wall yet. That way a surprise like old galvanised pipe is a documented adjustment, not an argument.
Should a plumbing quote include GST?
Yes, if you are registered for GST. Show a subtotal, the GST amount, and a GST-inclusive total so the client knows the final figure they will pay.


